XD motion at the Olympics in Rio 2016
posted:
22/08/2016
XD motion had installed the X-Track first at the canoe and Kayak competitions and then on the Modern Petathlon competition.
Thomas Bach, IOC President in Deodoro in front of the X-Track
advertisment
In partnership with AR Plus, XD motion installed a new Robotic Arm motion control for France TV Sport in their studios in the aquatics center the swimming competitions and in the Olympic stadium forĀ the Athletics competitions.
Aquatics Stadium
advertisment
Aquatics Stadium
FTV Studio in the Aquatics Stadium
advertisment
This was a first worldwide , the AR CAM allows to make many automatic movements and positions in a very restricted area where cranes or other grip equipment cannot fit in.
XD motion has installed the system and trained the local operators of FTV. During the competitions no technicians were needed, this helped to avoid additional cost for FTV.
Fred Gaillard FTV & Benoit Dentan XD motion in front of the AR+ Robotics
advertisment
FTV Studio at the Olympic Stadium
FTV Studio at the Olympic Stadium